[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: report to UCC



At 04:01 PM 8/22/2002 +0300, Badru Ntege wrote:
>the entire letter will be scanned and attached letter but here are some
>excerpts

UCC letter, in full, is scanned and attached in 2 formats.

the next concrete step is to get UTL, MTN & Afsat up & exchanging local
traffic ASAP since the three seem to have the least connectivity barriers.

but first we'll have to get the space where we're moving(lower ground floor)
cleared and wired-up for power as the 3 concurrently work around getting
their links to this new space.

thanks.

Title: ixp1

ixp2.jpg

Title: ixp2

ixp1.jpg