Re: Minutes of Thursday Meeting
Charles,
Hear are some 1 pence suggestions:
a) Why don't we just ask the building manager and we ran a 1.2KVA supply
line
to the roof with about 8 socket outlets? This should be quite easy and not
so expensive.
b) If conduits are to be used, they should be metallic and properly earthed
to the lightening protection line.
Isaac
----- Original Message -----
From: Charles Musisi <cmusisi@uol.co.ug>
To: <taskforce@uixp.co.ug>
Cc: <techies@uixp.co.ug>
Sent: Tuesday, February 19, 2002 7:18 PM
Subject: Re: Minutes of Thursday Meeting
> At 06:18 PM 2/19/2002 +0300, Isaac KASANA wrote:
>
> >Sorry Charles,
> >As a matter of principle, I feel we should pay for her work.
>
> Don't know really, however if that's the general feeling I suggest
> we plug it into the business plan from the onset and see how the
> numbers crunch.
>
> Isaac, I'll throw up the business plan to the list t'rrow with the
> revisions you suggested.
>
> For the latest update, the Power Back-up is installed & working - Mark
> Tinka from Sanyutel will ascertain workmanship t'rrow morning when
> he inspects, NCR has surveyed the rooftop, conduit in building
> and Exchange room facility. Some interesting revelations:
>
> Communications H'se doesn't have a power room(unlike the Sheraton) on
> the rooftop for comm. equipment. Which means either one runs Coax all
> the way down, or UTP/CAT5(>> 80m too long).
>
> Hard Option:
>
> We put a switch in UCC's 12th Floor server room(right below the rooftop)
> & interconnect 2 switches with Gigabyte fibre(~ 180m).. winding down a
> well protected duct and over in the ceiling(again wrapped in a trunk) on
> the 4th Floor. $$$$??? this blows a hole in budget.
>
> Extras:
>
> - switch
> - fibre and all that goes with it. estimates to ~3.5K
> - labor doubles
>
> Business plan draft will be posted t'rrow.
>
> -- Thanks
>
--